Tharisa meets FY2026 guidance, Karo Platinum fully funded as net debt swings to $51m

Tharisa has reported full-year production in line with guidance for both platinum group metals (PGMs) and chrome concentrates, while confirming its Karo Platinum project in Zimbabwe is now fully funded following a $300 million bond issue.

Yesterday

Israel’s diamond sector poised for revival following tax reforms and De Beers comeback

De Beers, one of the world's major diamond market players, has announced the resumption of its operations in Israel after a nine-year absence, which became the latest sign of revival of the diamond industry in the country.

Yesterday

Kefi Gold and Copper restarts Tulu Kapi development after safety review

Kefi Gold and Copper has resumed development at its Tulu Kapi gold project in Ethiopia following a suspension that began on September 7 after a serious safety incident three days earlier.

Yesterday

Nornickel implements smart melt monitoring system

Norilsk Nickel has installed a smart melt monitoring system at its metallurgical plant in Norilsk in collaboration with Reksoft. The system uses computer vision to assist the converter operator in identifying phases during the tapping process.

Yesterday

ALROSA to help amplify Arctic agenda at UN

In preparation for the 31st UN Climate Change Conference (COP31), ALROSA experts and other stakeholders from Russia discussed a unified approach to strengthening the country’s position and the Arctic agenda at UN climate conferences.

Yesterday

Palladium One reports near 250% increase in LK indicated resources in Finland

06 may 2022

(canadianminingjournal.com) - Palladium One Mining (TSXV: PDM; OTC: NKORF) has released an NI 43-101-compliant mineral resource update on its 100% owned Läntinen Koillismaa (LK) PGM-copper-nickel project located in north-central Finland. The new resource encompasses three open-pits in the Kaukua area, including an initial resource for Kaukua South and Murtolampi (altogether 210 drill holes totaling 44 km) and one at Haukiaho (84 drill holes totalling about 13,400 metres), located 10 km south of Kaukua. Indicated resources covering the Kaukua area are estimated at 38.2 million tonnes grading 0.61 g/t palladium, 0.22 g/t platinum, 0.07 g/t gold, 0.13% copper, 0.11% nickel and 64.56 g/t cobalt. This represents a significant increase of 248% over the previous indicated estimate. Nearly half (44%) of the total resource at the LK project is now in the indicated category. Inferred resources, contained in both the Kaukua and Murtolampi pit area and the Haukiaho zone, total 49.7 million tonnes grading 0.43 g/t palladium, 0.17 g/t platinum, 0.09 g/t gold, 0.16% copper, 0.14% nickel and 73.98 g/t cobalt, for a 14% increase.