Gold production in the Amur Region of Russia, both from ore and placer deposits, amounted to 16.7 tonnes from January to October 2026. This represents a 1.83% decrease compared to the same period in 2025, according to the regional Ministry of Natural Resources.
The bulk of the gold was produced by enterprises under Atlas Mining, such as Malomyrsky Mine LLC, TEMI LLC, and Pokrovsky Mine JSC.
The gold production target for the Amur Region for 2026 has been set at 21 tonnes. In 2025, the region produced 20.11 tonnes of gold (an increase of 6.3% over 2024), out of which 12.53 tonnes were mined at ore deposits, and 7.58 tonnes at placers.
Alex Shishlo, Editor in Chief of the European Bureau, Rough&Polished
